Photographs of the house and apartments from the construction site.
Photographs from the construction site, each group with the date it was taken. Tap a photo to open it full screen and browse. Furnished visualisations are with each apartment on the page Apartments.
Updated 27 October 2026 – new drone photos of the building taken on 6 October 2026.
As of 6 October 2026 · drone photosThe building from outside
The latest photos of the building: the white wings, the gables and the black attic band. Scaffolding remains mainly around the black core in the middle. The August photos are further down the page, so you can see how far the work has moved.
South frontAbove Jizerská streetWest wingBlack band in the atticRoof and gablesThe house and the woods aboveAmong the neighbouring housesStarý Harcov from aboveTowards Ještěd
As of 6 October 2026Inside the apartments
The apartments before the kitchens and fittings were installed. The full set of photos for each apartment is in its listing on the page Apartments.
Apartment 05 · 3+kk · 1st floor, west wing
Living roomBathroomView of Ještěd
Apartment 01 · 3+kk · ground floor, west wing
Living roomLiving room with kitchenetteBedroom
Apartment 09 · 3+kk · attic, west wing
Living roomLiving room with kitchenetteKitchenette
Apartment 04 · 3+kk · ground floor, east wing
Living roomKitchenetteHallway from the entrance
Apartment 08 · 3+kk · 1st floor, east wing
Living roomKitchenetteLiving room and hallway
Apartment 12 · 3+kk · attic, east wing
Living roomLiving room with kitchenette
Apartment 07 · 1+kk · 1st floor, black core
Living space towards the glazingView towards the entrance
Apartment 10 · 1+kk · 2nd floor, black core
Living space towards the glazingGlazing with a door to the balcony
As of 6 October 2026Common areas
StaircaseVaulted cellarCellar spaces
As of 14 August 2026Apartments 06 and 11
These two apartments were not photographed in October, so the photos are from August – still without floor coverings.
Apartment 06 · 1+kk · 1st floor, black core
Living space towards the glazingBathroomView of Ještěd
Apartment 11 · 1+kk · 2nd floor, black core
Living space towards the glazingBathroom
As of 14 August 2026 · drone photosThe building from outside in August
For comparison: the building in August, still fully in scaffolding and blue netting.
South elevationFrom the streetThe building on the hillsideIn a row of villasThe building and the forest above itThe building and the district
1887History
Building drawing from 1887